March 12th 63°F
Nice warm spring-like day, perfect for installing trim moldings. The trailer frame will be covered with 2" decorative trim.
Trim Installed
The Seam between the upper and lower radius is sanded, scraped, washed and then sealed with roof seal. After the seal is applied a J-rail rain gutter is attached to catch the water running down the top radius and channel it off the sides.
Upper Gutter installed with screw cover