Plumbing systems For the Cutter Built Trailer

 

water_system.jpg (158559 bytes)

Note: 12/11/05.... The area just behind the tank shutoff valve is now occupied by the sewer drain 3" main from the tank below the floor deck.

the toilet is on a platform above the bathroom floor to allow downward slope to the sewer tank

water systems image

trailer plumbing.jpg.tif (3169736 bytes)

Water systems diagram

 

DSCN9984.JPG (1030825 bytes)

Shower head control valve

 

DSCN2708.JPG (190516 bytes)

Kitchen Sink

DSC_0021.JPG (674765 bytes)

Main sewer drain pipes 3" and 1.5" with trap (Birdseye view)

DSC_0001.JPG (809233 bytes)

Toilet drain and water supply lines. Note: The battery charger is a temporary DC supply system for the build.  When the build is complete the battery charger is replaced by Deep cell RV batteries which will occupy this area. (Update April 06-  battery cannot be inside the RV!  Gas venting from the battery is caustic)  The DC inverter will be located here along with a storage bin that pulls out.  The bathroom vent will be built into the raised platform floor next to the toilet and the hose will port bad air out the electrical access port on the side of the trailer.

 

 

 

Specifications:

 

Fresh Water.............. 40 gallons

Gray / Black water.......35 gallons                  5 gallons are required to stay in system at all times

Hot Water.......................6 gallons

Heating method............Propane

Pressure........................... 30 psi

Pump...............................12volt 5amps

 

Trailer Build Menu