September 11th trailer work
Exterior Trim sections are being installed
Systems monitor is installed
The portage for the AC Exhaust. Cool air travels up the inside of the wall and out the vent at the top.
Back 5" of siding was installed and bent around the corner. This section is secured with Liquid Nails and screws.